Distinguish System Voltage from Equipment Class
A 35 kV designation describes the nominal voltage of the system or project, but it does not by itself establish the required equipment rating. Medium-voltage switchgear is commonly associated with a 38 kV equipment class for systems in this range; the project specification and applicable standards must determine the correct class. Confirm the maximum system voltage, grounding method, frequency, operating conditions and any expected voltage variations before selecting equipment. Also identify whether the feeder serves a utility source, transformer, motor, industrial process or another load, since the application affects protection and switching requirements. Avoid treating a familiar class designation as confirmation that a particular assembly is suitable. Qualified professionals should verify the equipment rating against the system study, governing requirements and the specific equipment documentation. Sharing a one-line diagram and project criteria early helps the manufacturer evaluate the intended application and identify rating questions before design details are finalized.
Define Insulation for the Operating Environment
Insulation selection must account for more than nominal voltage. Specify the required insulation level and dielectric withstand criteria in accordance with the applicable standards for the specific medium-voltage equipment, then verify that the proposed design addresses those requirements. Provide information about indoor or outdoor installation, altitude, ambient temperature, humidity, contamination, dust, corrosive exposure and available space. These conditions can influence insulation coordination, clearances, enclosure design and maintenance planning. Where the installation includes cable terminations, bus connections or interfaces to other equipment, document the interface dimensions and insulation requirements so components can be evaluated as a coordinated system. Ask how the design accommodates the specified environment and what installation or maintenance practices are needed to preserve insulation performance. Environmental assumptions should be explicit: a design evaluated for a clean, controlled room may not suit a location with conductive dust or moisture. Confirm applicable standards and project-specific requirements with qualified engineering personnel rather than assuming one insulation approach fits every 35 kV feeder.
| System | Voltage, phase, current and available fault current |
|---|---|
| Configuration | Lineup, protection, controls and enclosure as specified |
| Compliance | Applicable standards and listing confirmed for the assembly |
| Delivery | California and nationwide; schedule confirmed by quote |
Establish Interrupting and Momentary Duty
Feeder switchgear must be evaluated against the fault conditions it may encounter, not just the normal load current. Provide the available short-circuit current at the equipment terminals, the system X/R ratio when available, source and transformer data, and any planned operating configurations that could change fault duty. Distinguish interrupting capability from short-time withstand and momentary withstand requirements; these address related but different stresses and should be stated clearly in the project documents. Identify the switching device and its required duties, including the expected operating sequence and any applications involving frequent switching or specific load characteristics. Protection studies and system changes can affect the duty assessment, so include credible future additions or alternate feeds where relevant. Qualified professionals should confirm fault calculations, equipment ratings and coordination with upstream and downstream devices. Ask the manufacturer to review the stated values and assumptions against the proposed equipment design. A voltage class alone is not evidence that interrupting or withstand requirements are satisfied.
Coordinate Relays with the Feeder System
Relay coordination determines how faults are detected and isolated while limiting unnecessary interruption to healthy portions of the system. Share the protection philosophy, one-line diagram, fault-study results, transformer characteristics, load profile and coordination curves when requesting a design review. Clarify which functions are required, how the feeder interacts with upstream protection, and whether backup protection or communications with other devices are part of the project. Settings depend on the actual system and should be developed and approved by qualified protection professionals; equipment selection should not be based on a generic settings example. Consider instrument transformer ratios, relay inputs, control power, trip circuits and any interface requirements alongside the protection functions. These details can affect panel arrangements and wiring, so early coordination reduces the risk of late design changes. Confirm who is responsible for the protection study, relay configuration, testing and commissioning, and what information must be exchanged. Documenting those responsibilities helps connect the switchgear design to the complete protection scheme.
Prepare a Complete Specification Package
A useful request for 35 kV feeder switchgear includes the one-line diagram, system voltage and grounding, specified equipment class, load and fault data, insulation criteria, environmental conditions, feeder count, cable-entry preferences, control requirements and applicable standards. Identify project codes and standards by name and edition where known, and verify which requirements apply to this specific medium-voltage equipment. UL 891 applies to applicable low-voltage switchboards, not as a blanket standard for 35 kV equipment; do not use it as a substitute for identifying the standards relevant to the medium-voltage assembly. Include drawings, interface dimensions, installation constraints, required submittals and the project schedule for review. This information allows Switchgear Builder California to assess the requested new equipment and clarify open design inputs with your team. If schedule-sensitive options matter, raise them with the project documents; any such possibility depends on project review and confirmation. Before release, have qualified professionals verify ratings, protection, codes and interfaces for the intended installation.