Choose Between Switchgear and Switchboards
The right distribution assembly starts with the system it must protect and the way people will maintain it. New switchgear can provide a coordinated lineup of switching and protective devices, with options for compartmentation, power circuit breakers or protective relays depending on the design. A switchboard generally brings service or feeder distribution together in a compact assembly using selected breakers or fusible switches. Neither name alone establishes fault duty, maintenance access or operating capability. Compare the proposed equipment at its actual system voltage, continuous bus current and available fault current. Confirm that the assembly withstand or short-circuit rating and each interrupting device rating are suitable for the installation. Review feeder quantities, main and tie arrangements, access clearances and future expansion as well as the protection study. For low-voltage switchboards, identify whether UL 891 applies and verify the project’s required evidence and acceptance criteria. The engineer and authority having jurisdiction should confirm applicable requirements before release.
Match Motor Controls to the Loads
Motor control centers organize motor feeders and associated controls in a lineup, making them useful when a project has several pumps, fans, conveyors or process motors. A starter may be appropriate for a motor that runs at a fixed speed; a variable-frequency drive can support speed control when the process and motor permit it. Compare starting current, duty cycle, overload protection, disconnecting means and the available space for each motor circuit rather than choosing on horsepower alone. Provide the motor schedule, operating sequence and any required local or remote control functions. The design team should review feeder protection, the short-circuit current rating of each relevant assembly and the supply fault current. Drives also introduce heat, potential harmonics and grounding considerations that affect enclosure layout and system design. Clarify whether fixed or removable units are desired, how control power is supplied and which status or command signals must connect to the facility’s controls.
| System | Voltage, phase, current and available fault current |
|---|---|
| Configuration | Lineup, protection, controls and enclosure as specified |
| Compliance | Applicable standards and listing confirmed for the assembly |
| Delivery | California and nationwide; schedule confirmed by quote |
Plan Source Transfer and Standby Power
Transfer equipment connects selected loads to an alternate source when the normal supply is unavailable or when an authorized operating sequence calls for a change. A manual transfer arrangement relies on operator action, while an automatic transfer switch uses controls to initiate transfer and retransfer. Open-transition transfer interrupts the connection before closing onto the other source; closed-transition operation may momentarily parallel sources and requires a separate review of source compatibility and utility requirements. Identify the normal and standby source characteristics, load priorities, acceptable interruption and generator starting interface. The project engineer must determine whether the neutral should be switched and coordinate the grounding arrangement with the source configuration. Specify required interlocks, monitoring points, bypass provisions and the intended sequence for testing and restoring normal power. Verify voltage, current and short-circuit ratings for the proposed transfer equipment, and coordinate its protective devices with the rest of the distribution system.
Coordinate Downstream Distribution
A complete power distribution system may combine switchgear or switchboards with panelboards, motor controls, transfer equipment and busway or cable feeders. Panelboards organize branch circuits near the loads they serve, while busway can provide a concentrated distribution route with fixed connections or tap-off points where the selected design permits. Cable feeders offer routing flexibility, but conduit space and terminations must be planned alongside other building systems. Start with a single-line diagram and a load schedule that distinguish present demand from anticipated expansion. Confirm the number and location of feeders, distribution voltage, conductor sizes, voltage drop and neutral requirements with the electrical designer. Evaluate working clearances, cable bending space, enclosure exposure and installation access rather than looking only at the equipment footprint. Where continuity matters, review isolation points and selective coordination objectives using the project’s protection study. Spare spaces and future connections should be expressly identified in the drawings and verified against the proposed equipment ratings.
Review the Package Before Ordering
We manufacture new switchgear in the USA with American components, serving California projects and shipping nationwide. To develop a useful proposal, share the latest single-line diagram, load schedule, specifications, site conditions and desired delivery destination. Identify any utility metering or service requirements, expected review milestones and the installation team’s responsibilities. Confirm component origin or domestic-content documentation needed for the particular project during the quotation review. Before ordering, compare the submittal drawings with the intended source connections, feeder schedule, dimensions, cable entry and required clearances. Agree on applicable standards, documentation, factory inspection or testing scope, and the parties responsible for settings, installation and field commissioning. If the new equipment connects to a customer-owned system, verify existing nameplates and interfaces rather than assuming capacity or compatibility. Discuss shipping splits, unloading constraints and the project schedule with the manufacturer; component availability, approvals and freight arrangements should be confirmed for the actual order.