MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Close-up of tall gray switchgear cabinets with orange labels and visible breakers on wooden pallets.
AMERICAN BUILT   /   CALIFORNIA SERVED

35 kV Load-Break Switchgear

Use the project’s electrical data to assess load switching, insulation coordination, and fault protection for 35 kV-class applications.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Confirm System Voltage and Equipment Class

A project described as 35 kV requires more than matching a nominal-voltage label. Establish the system’s nominal and maximum operating voltage, grounding method, frequency, and expected operating conditions, then confirm the equipment class and ratings appropriate to that system. Equipment for a 35 kV nominal application is often evaluated in a 38 kV class, but that convention is not a substitute for checking the project specification, applicable standards, or utility requirements. The distinction matters because insulation levels and other ratings are assigned to the equipment, while system voltage describes the network in which it will operate. Share one-line diagrams, service data, and any owner or utility criteria early so the design discussion can address the actual application. Qualified electrical professionals should determine the required ratings and verify that selected equipment is suitable for the installation.

Define the Load-Break Switching Duty

Load-break switchgear is intended to switch specified load currents under defined conditions; it should not be treated as a general-purpose fault-interrupting device. Identify normal and maximum load current, switching frequency, the circuits or transformers being controlled, and the operating sequence expected during routine service or transfer. Also clarify whether switching is manual, electrically operated, interlocked, or coordinated with other devices, since those functional needs can affect the arrangement and control scheme. Review the switch’s assigned duty and operating limits against the actual application rather than assuming that a voltage class alone establishes suitability. If the system may require switching under unusual conditions, such as transformer magnetizing current or cable-charging current, document those conditions for engineering review. A clear duty description helps distinguish normal switching requirements from fault-clearing responsibilities and reduces ambiguity in procurement documents.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Coordinate Insulation and Surge Protection

Insulation selection should reflect the system’s voltage, grounding, exposure, and operating environment. The specification should identify required power-frequency withstand and impulse withstand levels where applicable, along with clearances, phase spacing, and insulation medium or construction constraints relevant to the installation. Consider how switching surges, lightning exposure, cable lengths, transformer connections, and grounding affect the insulation-coordination study. Surge arresters may be part of the broader protection design, but their selection and placement should be evaluated with the system study rather than added as a generic accessory. Environmental conditions also matter: altitude, ambient temperature, contamination, moisture, and enclosure location can influence equipment application and required derating or protective measures. Provide site data and any owner-mandated insulation criteria for review. The design team can then verify that the proposed equipment ratings and associated protective devices align with the project’s documented insulation requirements.

Assign Fault Interruption to the Protection Scheme

A load-break switch should not be presumed capable of interrupting the prospective short-circuit current at its location. Determine available fault current, system X/R considerations when relevant, and the required clearing time, then identify which upstream or associated protective device will interrupt a fault. The protection scheme may involve circuit breakers, fuses, relays, or other devices selected for the system; coordination must establish that their interrupting ratings and settings are appropriate for the fault duty. Clarify whether the switchgear arrangement includes a means of isolating equipment after the protective device operates, and document the intended operating sequence and interlocks. Protection studies should account for source configurations, transformer impedance, parallel operation, and future system changes that could raise fault levels. Qualified professionals must establish protection, ratings, and applicable code requirements. Provide the latest one-line and study data so the equipment application can be reviewed against the complete scheme.

Prepare a Review-Ready Specification

A useful inquiry package connects electrical requirements with installation and operational needs. Include the one-line diagram, nominal and maximum system voltage, requested equipment class, load current, grounding details, available fault-current data, and the proposed upstream protection. Add the required insulation levels, environmental conditions, enclosure location, cable entry and termination details, control power, metering or indication needs, and any interlocking or remote-operation functions. Identify applicable owner, utility, and project standards, and ask which standards govern the specific medium-voltage equipment; requirements should be verified for the equipment type and application rather than assumed from a low-voltage standard. State whether drawings, studies, or interface details are still pending, since open items can affect design review and schedule. Switchgear Builder California builds new equipment in the USA with American components and supplies customers in California and nationwide. Schedule-sensitive options, if considered, depend on project review. Use the completed package to request a technical discussion and confirm ratings before procurement.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE