MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Three tall gray electrical switchgear cabinets with open doors on wooden pallets in a large indoor space.
AMERICAN BUILT   /   CALIFORNIA SERVED

Seismic and Wind Design Criteria

Provide site-specific loading criteria early so switchgear design, support conditions, and required documentation can be evaluated together.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Start with the governing project criteria

Seismic and wind requirements are project inputs, not generic equipment attributes. Begin by identifying the governing building code and edition, the project’s adopted design criteria, and any owner, engineer, or authority requirements that supplement them. For seismic design, relevant information may include the applicable seismic design category, mapped parameters, site class, importance factor, and the component amplification or response factors specified for electrical equipment. Wind criteria may include basic wind speed, exposure category, risk category, and any applicable internal pressure or special site provisions. The responsible design professional should establish and interpret these values; a switchgear supplier should not substitute assumptions for the project engineer’s criteria. If the project has not finalized its basis of design, identify what remains open and who will resolve it. A complete, consistent criteria set helps prevent late changes to equipment arrangement, anchorage details, or supporting construction.

Describe the site and installation conditions

Loading criteria need to be considered alongside where and how the assembly will be installed. Provide the project location, indoor or outdoor designation, building level or elevation, and the room or enclosure conditions that affect exposure. Clarify whether the equipment sits on a housekeeping pad, structural steel, a raised floor, or another support, and identify the intended anchorage surface and responsible trade. Include available dimensions, allowable footprint, access constraints, and any known limits on pad thickness, edge distance, or anchor embedment. For outdoor applications, explain the equipment’s relationship to surrounding structures and barriers, as well as any project-specific wind exposure assumptions. For seismic review, note whether the installation has flexible connections, adjacent equipment, or clearance requirements that may affect movement or restraint. These details are not a substitute for structural engineering; they allow the equipment and anchorage review to use conditions that reflect the actual installation rather than an idealized, unsupported arrangement.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Match equipment scope to the design review

Define what the loading evaluation is expected to cover. Identify the switchgear lineup or sections, approximate arrangement, enclosure type, and major components included in the scope. State whether the review concerns the equipment assembly alone, the anchorage, or both, and clarify any exclusions such as the building structure, concrete pad, cable supports, or field-installed accessories. Configuration matters: changes in section count, dimensions, mass distribution, component placement, or enclosure can affect the information needed for analysis. Provide available equipment weights and center-of-gravity information when known, while distinguishing confirmed data from planning estimates. If final weights are pending, say so and establish when they are required. Likewise, identify lifting features, shipping splits, and field joining details if these influence installation or the load path. Clear boundaries help the project team avoid treating an equipment submittal as structural approval, or assuming that an anchorage detail addresses every supporting element.

Request useful calculations and drawings

Specify the documentation expected for design coordination and construction. Depending on the project, this may include equipment dimensions and weights, anchor layout, base or mounting details, reactions or loads transmitted to supports, and a calculation or engineering evaluation addressing the stated criteria. Identify the required format, review sequence, drawing scale, and whether sealed calculations are required by the contract or authority. For anchorage, provide the proposed anchor type and size if already selected, along with substrate strength, thickness, reinforcement information, and edge-distance constraints; the qualified structural professional must determine whether the design is suitable. Ask that assumptions, limitations, and design criteria be stated clearly so reviewers can compare the documentation with the project basis. Where equipment-level seismic evidence is required, define the acceptance method and the specific configuration it must represent. Do not treat a calculation, test report, or design statement as proof of a third-party listing or approval unless the relevant authority has verified that status.

Coordinate reviews before release and installation

Seismic and wind coordination works best when criteria and interfaces are settled before equipment drawings are released for construction. Send the complete criteria package with the equipment inquiry or submittal request, including the responsible engineer’s contact and the date by which review comments are needed. Flag unresolved values, requested deviations, and any schedule-sensitive milestones; options for expedited review may be considered after project scope is assessed, but timing depends on the information and review required. During review, reconcile equipment drawings with structural details, conduit and cable entry, clearances, and field installation instructions. Route changes in the criteria or equipment configuration back through the responsible design professionals rather than relying on an outdated calculation. Before installation, confirm that delivered equipment, support conditions, anchors, and approved documents match the coordinated design. Qualified professionals must determine protection, ratings, anchorage, and applicable codes for the project. This disciplined handoff gives contractors and buyers a practical basis for procurement, submittal tracking, and safe installation.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE