MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Three gray switchgear cabinets with open doors and breaker panels on wooden pallets indoors.
AMERICAN BUILT   /   CALIFORNIA SERVED

800 Amp Switchboards

Compare main and feeder configurations for an 800 A commercial switchboard, then verify bus and device ratings against project conditions.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Start with the Distribution Plan

An 800 A switchboard is a distribution choice, not a complete description of the assembly. Begin by mapping the service or upstream source, the loads to be served, and the downstream panels or equipment. For commercial projects, this often means identifying which loads require dedicated feeders, which can be grouped, and where distribution points should sit relative to the spaces they serve. The plan affects section arrangement, feeder count, cable routing, and the space needed for future work. Gather the one-line diagram, service characteristics, load information, and site constraints before settling on a layout. Confirm the nominal voltage, phase, frequency, grounding arrangement, and available fault current with the project team. These inputs help the manufacturer develop a configuration for review; qualified professionals remain responsible for determining suitable protection, ratings, and applicable code requirements.

Choose Main Protection for the System

The main device and its protective functions should be selected in context of the upstream source and downstream coordination goals. A main breaker or another main arrangement may affect isolation, overcurrent protection, operating access, and the way the board is divided into sections. The appropriate choice depends on the electrical design and project requirements, not simply on an 800 A label. Review the available fault current, upstream protective device, conductor assumptions, grounding and bonding details, and any required selective coordination or service protection criteria. Confirm trip functions, settings, and adjustment ranges with the engineer of record and the equipment design team. Consider how operators will access the main and whether the intended operating sequence is practical. Protection settings must be established by qualified professionals; equipment selection alone does not establish coordination or suitability for a particular installation.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Shape Feeder Groups Around Actual Loads

Feeder arrangement should reflect the loads, routing, and maintenance strategy rather than a generic count of outgoing circuits. List each feeder’s destination, expected load, conductor approach, and protective-device requirements. Grouping related loads may simplify identification and distribution, while separating critical or operationally distinct loads can support clearer isolation and troubleshooting. The number and placement of feeder devices influence the board’s section widths, internal clearances, and access for terminations. Provide realistic feeder schedules early, including any spare positions or planned future circuits, so the layout can be evaluated before details are fixed. Do not assume that spare physical space automatically provides usable capacity: the bus, device, enclosure, and thermal design must all be considered. Verify feeder-device ratings independently against calculated loads, conductors, fault conditions, and applicable project criteria with the responsible electrical professionals.

Plan Layout, Access, and Installation

A workable switchboard layout balances electrical arrangement with the realities of the electrical room and installation path. Share available room dimensions, working-space constraints, door and corridor clearances, equipment orientation, and the intended cable-entry direction. Identify overhead obstructions, housekeeping pads, nearby piping, and any limits on section size or movement to the final location. Front or rear access needs, cable bending space, and termination locations can influence the section sequence and enclosure dimensions. Coordinate these details with the building and electrical teams before approving drawings; late changes can affect feeder routing and room interfaces. Also confirm how the equipment will be anchored and connected to the grounding system under the project design. Installation, access, and safe work practices should be reviewed by qualified personnel against applicable codes and site conditions. Clear site information helps avoid a layout that fits electrically but not physically.

Reserve Future Capacity and Verify Ratings

Future load allowance is most useful when it is defined rather than expressed as a vague percentage. Identify anticipated additions, their approximate demand, likely feeder locations, and whether they may require separate protection or particular operating arrangements. Then distinguish between spare device spaces, spare bus capacity, and available capacity in the service and upstream system; these are related but not interchangeable. For an 800 A configuration, the nominal current alone does not confirm that every bus section or device is suitable for the application. Bus ampacity, protective-device ratings, interrupting or withstand considerations, temperature conditions, and available fault current must each be evaluated for the specific design. Provide the latest one-line diagram, load calculations, equipment schedules, and site requirements for review. Confirm applicable standards for the specific assembly and installation with qualified professionals, and resolve open rating questions before drawings are released for production.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE