MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical switchgear cabinets with red circuit markings and breaker handles arranged on pallets.
AMERICAN BUILT   /   CALIFORNIA SERVED

2000 Amp Switchboards

A 2000 A designation is a starting point, not a complete equipment specification. Define the service, distribution arrangement, physical layout and ratings as coordinated project inputs.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Establish the service and main arrangement

Start with the service characteristics and the role the switchboard will perform. Confirm system voltage, phase and wire configuration, frequency, available fault current, grounding method, and whether the assembly serves as service equipment or downstream distribution. A 2000 A rating identifies a current level to evaluate; it does not establish the bus rating, interrupting capacity, short-circuit withstand, or suitability for a particular installation. For a higher-current service, clarify whether the project requires one main device, multiple mains, or another engineered arrangement, and determine how the utility connection and upstream protection affect the design. Main-device selection also influences compartment space, cable access, heat dissipation, and maintenance clearances. Provide the one-line diagram and source information early, including transformer details and upstream protective-device data when available. Qualified project professionals should determine applicable codes, protection and ratings, then verify that the proposed configuration meets those requirements.

Coordinate feeder count, size and function

Feeder planning turns the incoming service into a workable distribution scheme. Identify each load or downstream panel, its operating current, demand assumptions, load type, and any starting or transient characteristics that affect protection. Then specify the number and type of outgoing devices, anticipated conductor sizes, termination requirements, and whether spare capacity or future feeder positions are needed. A 2000 A switchboard does not mean every feeder can be loaded to its device rating at once; the complete distribution and protection design must account for applicable demand, temperature and installation conditions. Compare a larger number of smaller feeders with fewer, higher-capacity circuits: the choice affects enclosure width, cable bending space, service access and the complexity of coordination. Indicate special loads, emergency or standby relationships, metering needs, and required interlocks on the drawings. Final feeder-device ratings and interrupting capabilities must be evaluated separately from the switchboard’s nominal current designation.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Treat bus bracing as a separate design input

Bus current rating and bus bracing address different engineering questions. Current rating concerns the intended continuous current under specified conditions; bracing relates to the assembly’s ability to withstand the mechanical forces associated with a fault, in coordination with the protective system and installation. Do not derive a bracing requirement from the 2000 A label alone. Obtain the available fault-current information at the switchboard location and identify the upstream protective device, including its relevant characteristics and settings where known. The project team can then establish the required short-circuit withstand or interrupting performance for the equipment and verify that the selected devices and bus arrangement are compatible. Confirm the applicable standards for the specific equipment and installation rather than assuming one standard covers every voltage class or assembly type. For applicable low-voltage switchboards, UL 891 may be a relevant standard to evaluate; mentioning it does not establish a listing. Qualified professionals must confirm the actual requirements and evidence for the project.

Lay out sections for access and installation

A practical lineup must fit the electrical design and the route into the building. Develop a section-by-section arrangement showing the main, feeder devices, metering and any auxiliary compartments, then review working clearances, door operation, conductor entry, bending space, and access for installation and service. Room dimensions, floor conditions, overhead obstructions, egress paths and the equipment’s final position can constrain the lineup even when the electrical arrangement is sound. Coordinate conduit locations and cable approach with the switchboard layout before construction documents are finalized; late changes can force tradeoffs among compartment widths, termination access and field routing. Identify whether equipment must pass through doors, corridors, elevators or other restricted paths, and share those dimensions with the manufacturer for review. Also clarify environmental conditions and any enclosure or finish requirements that the project documents call for. Early coordination helps expose conflicts while there is still time to adjust the arrangement rather than relying on field modifications.

Plan delivery splits and verify the submittal

A long or heavy lineup may need to be divided into shipping sections to accommodate transportation, site access or handling limits. A delivery split is a physical and logistical decision, not merely a drawing detail: it affects section dimensions, joining points, bus connections, field assembly and the sequence of receiving and installation. Provide the unloading method, access route, doorway and turning constraints, available lifting equipment, and any site restrictions for delivery review. Confirm who is responsible for field joining and what documentation or qualified labor the installation plan requires. Before release, reconcile the one-line diagram, elevations, schedules and specifications, checking main and feeder functions, system data, device requirements, bus rating and bracing inputs, metering, termination provisions, and physical dimensions. Ask the manufacturer to identify open design questions and assumptions so the project team can resolve them in writing. Schedule-sensitive or expedited options may be considered after project review, but timing depends on configuration and circumstances and should be confirmed before commitments are made.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE