Current Transformer

A current transformer reproduces primary current at a reduced, proportional level so instruments and protective relays can measure system current safely and consistently.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

What a Current Transformer Does

A current transformer, commonly abbreviated CT, is an instrument transformer that produces a secondary current proportional to the current flowing in its primary circuit. The primary may be a conductor passing through a window, a bus, or a winding, depending on the CT construction. Its secondary current is scaled for connection to compatible meters, monitoring devices, or protective relays. For example, a CT ratio expresses the relationship between rated primary current and rated secondary current; a 600:5 ratio indicates that 600 amperes on the primary corresponds to 5 amperes on the secondary under the specified conditions. The ratio is not a general-purpose reduction factor for any instrument: connected devices and wiring must be selected for the CT’s secondary rating and intended use. A CT enables measurement and protection circuits to work with a representative current signal rather than carrying full circuit current through sensitive equipment.

How CTs Support Metering and Protection

Metering CTs provide current inputs for instruments that display, record, or communicate electrical consumption and operating conditions. Their accuracy requirements matter when readings are used for energy accounting, load studies, or operational decisions. Protection CTs provide signals to relays that evaluate abnormal conditions and may initiate a trip through the protection scheme. These uses can place different demands on CT performance: a metering application may emphasize accuracy across a normal operating range, while a protection application must be considered against expected fault current and the relay’s needs. Some installations use separate CT cores or devices for these functions so each circuit can be coordinated appropriately. The selection is not complete by choosing a ratio alone. The engineer should assess the connected burden, including instrument inputs and lead wiring, and verify accuracy or protection performance at the conditions relevant to the application.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Ratio, Accuracy and Burden

A CT ratio should reflect the circuit’s expected operating current while remaining suitable for the measurement range or protective function. A ratio chosen too high can reduce useful resolution at ordinary loads; a ratio chosen too low may not fit the anticipated current or fault-duty requirements. Accuracy class, rated burden, frequency, and applicable performance characteristics should be reviewed against the equipment connected to the secondary. Burden is the electrical load presented by meters, relays, and conductors; long or undersized secondary wiring can add impedance and affect performance. For protection, engineers also consider how the CT responds during high-current events and whether its characteristics coordinate with the relay settings and system study. Confirm the manufacturer’s data and project criteria rather than assuming that a nominal ratio guarantees adequate performance. The responsible electrical professional determines the applicable ratings, protection design, and code requirements for each installation.

Installation and Secondary-Circuit Safety

CT secondary circuits require deliberate handling. When primary current is flowing, an open-circuited CT secondary can develop a hazardous voltage and may expose personnel or damage equipment. Qualified professionals follow the CT manufacturer’s instructions and established electrical safety practices, including appropriate shorting provisions and procedures before disconnecting instruments or relays. The secondary circuit should be grounded and arranged as required by the design and applicable rules; grounding details depend on the system and installation. Polarity markings identify the relative direction of primary and secondary current and matter when connecting meters, relays, or differential protection. Incorrect polarity or phase assignment can cause misleading readings or impair a protection scheme. Wiring diagrams, terminal labels, and commissioning checks should be reviewed together. Do not treat a CT as an ordinary current sensor that can be disconnected without regard to its energized primary circuit.

Specifying CTs in Switchgear Projects

When requesting a CT for new switchgear, provide the one-line diagram, system voltage and frequency, nominal and maximum load current, anticipated fault conditions, and the intended metering or protection function. Identify the connected meter or relay, desired secondary rating, ratio, accuracy or protection criteria, burden assumptions, conductor or bus arrangement, and any space or mounting constraints. Also clarify whether the design calls for dedicated cores or separate devices for different functions, and how CT polarity and terminals should appear on drawings. These details allow the equipment design and protection review to address fit, wiring, coordination, and project-specific requirements together. For medium- or high-voltage equipment, identify and verify the standards applicable to that specific equipment; requirements vary by application and do not, by themselves, establish a third-party listing. Review final drawings and CT data with qualified project professionals before equipment is built and commissioned.