MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical switchgear cabinets with red circuit markings and breaker handles arranged on pallets.
AMERICAN BUILT   /   CALIFORNIA SERVED

Service-Entrance Switchgear

Coordinate the building’s incoming service, disconnecting means, grounding and bonding, and metering before equipment design is finalized.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Define the Service-Entrance Arrangement

Service-entrance switchgear is the point where utility-supplied power enters a building’s electrical distribution system, so its arrangement affects both utility coordination and downstream design. Begin by identifying the service voltage, phase, frequency, available fault current, expected load, and the number and location of service disconnects. Confirm whether the project calls for a single service section or multiple sections, and how feeders will leave the equipment for building distribution. These are design inputs, not assumptions to carry over from another facility: utility conditions, adopted codes, and site plans can differ substantially. Provide one-line diagrams, load summaries, equipment-room plans, and known utility data early so the manufacturer and project engineer can review the same basis. For a new installation, resolving the service boundary and equipment layout early helps limit redesign and clarifies which interfaces require approval before fabrication.

Coordinate Disconnects and Protection

Service disconnect selection and placement must follow the project’s applicable electrical code and utility requirements. The design team should establish the required number of disconnects, their grouping and accessibility, the means of operating them, and how they relate to overcurrent protection and downstream distribution. Where multiple disconnects or distribution sections are contemplated, check the one-line against the physical arrangement; an electrically sound concept still has to fit the available room and provide safe working access. Available fault current is a critical input for evaluating equipment ratings and protective-device coordination. Qualified professionals should determine the required interrupting and withstand ratings, protection settings, and coordination approach using the actual system data. Do not select a rating from nominal voltage alone. Share transformer information, utility fault-current data when available, feeder details, and existing coordination studies. Any unresolved values should be identified for confirmation rather than treated as established design conditions.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Resolve Grounding and Bonding at the Entrance

Grounding and bonding decisions at service equipment shape how the system responds to faults and how downstream equipment is connected. The project engineer must identify the service grounding point, neutral-to-ground bonding arrangement, grounding electrode connections, and the treatment of neutral and equipment-grounding conductors in downstream feeders. These details depend on the service configuration and applicable code; they should be shown consistently on the one-line, grounding details, and equipment drawings. In a multi-section lineup, verify how the neutral, grounding bus, and bonding connections continue between sections, and make sure the intended arrangement is clear to installers and inspectors. Avoid relying on a generic drawing or a previous project where service conditions differ. Provide the engineer’s grounding design and any utility-specific instructions for review, then reconcile comments before release. Qualified electrical professionals determine the final bonding and grounding provisions for the installation, including field connections that are outside the equipment assembly.

Plan Metering and Utility Interfaces

Metering requirements can affect both the electrical arrangement and the physical dimensions of service-entrance equipment. Confirm with the serving utility whether metering is utility-furnished, customer-furnished, or addressed through another project-specific arrangement, and identify the required meter location, access, instrument transformers, test provisions, and wiring interfaces. Utility practices vary, and a detail accepted for one territory or service class may not apply elsewhere. Obtain current service manuals, written comments, or project-specific instructions where possible; then share them with the design team and equipment builder. Also clarify ownership and responsibility at the service point, the location of seals or restricted-access areas, and any requirements for routing conductors or communicating meter data. Utility review is not a substitute for code review, nor should equipment fabrication be treated as evidence of utility acceptance. Keep the utility’s review milestones visible in the project schedule and resolve comments affecting layout or wiring before final drawings are approved.

Prepare a Reviewable Equipment Package

A complete inquiry helps establish whether the proposed service-entrance arrangement fits the project and what remains to be confirmed. Send the one-line diagram, load and fault-current information, service and metering requirements, utility correspondence, available room dimensions, cable-entry preferences, and the applicable project specifications. Identify environmental conditions, access constraints, seismic or other project criteria, and any required equipment interfaces so they can be reviewed as design inputs. For low-voltage switchboards, determine whether UL 891 applies to the project and confirm the relevant requirements; that standard concerns applicable low-voltage switchboards, not all service-entrance equipment. For medium- or high-voltage equipment, identify and verify the standards applicable to that specific equipment. Standards compliance does not by itself establish a third-party listing. Switchgear Builder California builds new equipment in the USA with American components and supplies customers in California and nationwide. Schedule-sensitive options can be discussed subject to project review; qualified professionals must establish final ratings, protection, codes, and approvals.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE