MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical equipment with meters and breakers inside an open enclosure.
AMERICAN BUILT   /   CALIFORNIA SERVED

Circuit Breaker Switchboards

Plan breaker-based mains and feeders around system conditions, protection coordination, operating needs and realistic space for future circuits.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Choose the Breaker Architecture for the System

A circuit breaker switchboard uses breakers for the main and outgoing circuits, giving the design team a means to interrupt current and protect conductors when the selected devices and settings are appropriate to the application. Start by defining the service arrangement: voltage, phase, frequency, available fault current, grounding method, source configuration and the number and size of feeders. These inputs determine the electrical and physical design; they are not interchangeable assumptions. Confirm whether the main should be a breaker, whether a main-tie-main arrangement is under consideration, and how sources are intended to operate during normal and alternate conditions. Breaker-based distribution can support selective isolation of individual circuits, but the actual operating flexibility depends on the chosen arrangement and coordination. Provide one-line diagrams, load schedules and utility or upstream-source information early. Qualified professionals should establish ratings, protection and applicable code requirements for the specific installation.

Size Main and Feeder Breakers Together

A main breaker and its feeder breakers need to be evaluated as a coordinated system, not selected independently from nominal load alone. Share calculated demand, continuous-load considerations, motor starting or transformer inrush, and any loads with unusual duty cycles. The design team can then assess breaker frame and trip ranges, conductor protection, interrupting requirements and the relationship between upstream and downstream devices. Available fault current at the switchboard is a key input: a device's interrupting rating must be suitable for the conditions at its point of installation, and any series-rated approach requires careful verification of the specific equipment combination and applicable rules. Avoid assuming that a larger breaker automatically improves reliability; settings that are too high can compromise protection, while settings that are too low may cause unwanted trips. Document proposed settings and coordination assumptions for review by the responsible electrical engineer and protection specialists.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Match Trip Functions to Protection Goals

Trip options should follow the protection study and operating objectives. Depending on the breaker and design under review, trip units may offer adjustable long-time, short-time, instantaneous or ground-fault functions, while some applications may use simpler thermal-magnetic protection. Availability and suitability vary by device, rating and configuration, so identify the function needed rather than assuming a particular feature is standard. Ask whether selective coordination is required, which loads are critical, and whether ground-fault protection is required or appropriate for the service. Settings must account for conductor limits, fault levels, downstream device behavior and equipment withstand, with arc-flash analysis considered where applicable. Electronic trip units may support more precise adjustment or additional monitoring functions, but added capability brings configuration and commissioning responsibilities. Include protection study results, desired settings, trip-unit preferences and any communication or monitoring requirements in the project documents, then verify the final design before energization.

Plan Circuit Expansion with Physical Limits in View

Future circuit capacity is useful only when the original design makes room for it electrically and physically. Identify expected additions by load type, approximate current, voltage and likely timing, and distinguish firm planned circuits from speculative growth. The designer can evaluate spare breaker positions, bus capacity, enclosure dimensions, cable landing space and the effect of future loads on the main and feeder protection. An empty space or unused position does not by itself establish that a future breaker can be added; bus ratings, bracing, thermal conditions, internal clearances and the overall assembly design also matter. If future work may involve larger loads, additional sources or changed fault current, describe those scenarios now so they can inform the initial design. Expansion should be performed only under an approved design by qualified personnel, with the equipment de-energized and safe-work practices followed as required. Clear spare-capacity assumptions help avoid costly surprises.

Prepare a Complete RFQ and Verify Project Requirements

A useful request for quotation includes the one-line diagram, equipment schedule, load data, site conditions, required enclosure details, cable-entry preferences and the governing project specifications. State the service and feeder ratings, fault-current information, main arrangement, trip functions, metering or communications needs, and known expansion plans. Identify applicable standards and code requirements for the specific equipment and jurisdiction; for medium- or high-voltage equipment, verify the standards that apply to that equipment rather than carrying over low-voltage assumptions. If the scope is a low-voltage switchboard, UL 891 applies to applicable low-voltage switchboards, but a standards reference alone does not establish a third-party listing. Switchgear Builder California builds new equipment in the USA with American components and supplies customers in California and nationwide. Share schedule constraints as early as possible; any schedule-sensitive or expedited option depends on project review. Review drawings, ratings and protection details before approval.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE