MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical equipment with meters and breakers inside an open enclosure.
AMERICAN BUILT   /   CALIFORNIA SERVED

Automatic Transfer Switches

Plan automatic transfer around the sources, loads and sequence your facility depends on. Share operating requirements early so the equipment design can be reviewed against the application.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Define the Normal and Alternate Sources

An automatic transfer switch (ATS) shifts designated loads between a normal source and an alternate source when conditions require it. Begin by documenting what each source is, how it is supplied and what constitutes an acceptable source. Relevant inputs may include nominal voltage and frequency, phase, available fault current, grounding arrangement, and the limits within which the load can operate. For a generator-backed system, explain how the generator starts, reaches acceptable output and signals readiness. For a utility-to-utility arrangement, identify which source is preferred and whether both are expected to remain available under normal conditions. These details affect sensing, permissives and transfer logic; a source should not be treated as usable solely because voltage is present. Provide one-line diagrams, equipment schedules and the intended operating narrative for review. Qualified professionals must establish applicable ratings, protection and code requirements for the specific installation.

Specify the Full Transfer Sequence

Describe the sequence from the first abnormal condition through restoration, not merely the instruction to transfer. State which parameters the controls monitor, how long an out-of-range condition must persist before action, and whether a delay is intended to avoid nuisance operation during brief disturbances. Explain what must happen before the alternate source is accepted, including generator start and stabilization where applicable. Then define how the transfer device operates, what indications or alarms are required, and how the system behaves if the alternate source fails to become acceptable. On return of the preferred source, identify whether retransfer is automatic, delayed, or operator-controlled, and whether the alternate source should cool down before shutdown. Also clarify behavior during testing, loss of control power and conflicting commands. A written sequence helps engineers, the equipment builder and commissioning personnel resolve assumptions before they become field changes.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Match Transfer Behavior to the Loads

Load characteristics determine what transfer method and interruption are acceptable. List critical loads and distinguish those that can tolerate a brief break from loads needing tighter continuity or a coordinated restart. Motors, transformers and other inductive loads can retain residual voltage after disconnection; transferring too quickly may create electrical and mechanical stress. Conversely, excessive delay can disrupt processes or cause control systems to drop out. Confirm whether load shedding, staged restoration or priority-based pickup is needed when the alternate source has limited capacity. Identify electronic loads, controls and downstream equipment that may require a defined transfer interval or restart logic. If the application calls for transition without an intentional interruption, or for a particular open- or closed-transition behavior, state that as a design requirement for review rather than assuming it is suitable. The final choice must account for source synchronization, system constraints, load response and applicable project requirements.

Coordinate Protection, Controls and Interfaces

An ATS is one part of a power system, so its sensing and switching decisions must fit the upstream and downstream design. Provide protection device types and settings where available, fault-current information, conductor and grounding details, and the relevant portions of the one-line diagram. The engineering review should consider how transfer affects overcurrent coordination, short-circuit ratings and any required isolation or bypass functions. Identify interfaces to generator controls, building management systems, fire alarm or other supervisory systems, and specify whether each signal is a dry contact, network point or another defined interface. List required local indications, remote alarms, event records and operator controls. Clarify who supplies related controls and wiring so the boundary between switchgear, generator package and field installation is clear. Applicable standards and codes depend on equipment type and project jurisdiction; qualified professionals should determine and verify them. Where low-voltage switchboards are involved, UL 891 may apply to the switchboard, but that does not establish a listing for every component or assembly.

Prepare the Project Package for Review

A focused information package makes design review more effective. Include the application voltage, phase and frequency; source descriptions; load inventory and priorities; available fault-current data; transfer and retransfer narrative; preferred control and alarm interfaces; installation constraints; and required drawings or submittals. Mark unresolved items explicitly, such as generator readiness contacts, acceptable voltage windows, control-power source or the response to a failed transfer. For replacement planning, document the existing installation and the customer's intended changes; any modernization discussion concerns that customer-owned equipment, not a purchase of it. Switchgear Builder California builds new equipment in the USA using American components and supplies equipment to customers in California and nationwide. The project team can review schedule-sensitive or expedited possibilities when requested, subject to scope and project review; timing is not assumed. After requirements are aligned, confirm design inputs, interfaces, ratings and applicable standards before release for fabrication and coordinate installation and commissioning with qualified professionals.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE