MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical switchgear beneath overhead conduits in an industrial room, with gallery arrows overlaid on the image.
AMERICAN BUILT   /   CALIFORNIA SERVED

Airport Terminal Emergency Power

Coordinate backup-source transfer and distribution so airport terminal services and essential systems can respond to an interruption as intended.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Start with essential terminal loads

Emergency-power planning for an airport terminal begins with a clear load inventory, not a generic assumption that every circuit should transfer together. Identify which systems must remain available during an outage, which can tolerate a brief interruption, and which should be shed or restored in stages. Depending on the facility, the review may include life-safety functions, emergency lighting, communications, security, operational technology, selected passenger-processing equipment, and support services. The airport’s electrical and operations teams should confirm the actual priorities and applicable code requirements for each load. Record connected and demand loads, starting characteristics, power quality sensitivities, and expected operating duration where known. This information helps define the switchgear arrangement, feeder grouping, and transfer sequence. It also exposes conflicts early—for example, a large motor starting at the same time as sensitive electronic loads are being restored. A documented load hierarchy gives designers and equipment builders a practical basis for coordination.

Coordinate sources and transfer logic

The emergency-power scheme should be evaluated as a complete path from normal source through transfer equipment and distribution to the intended loads. Confirm the normal and alternate sources, their electrical characteristics, grounding and neutral arrangements, available fault current, and the operating conditions under which transfer is permitted. The design team must establish whether transfer is open-transition, closed-transition, or another approved approach; that choice affects source interaction, interruption, and protection coordination. Interlocks and control logic should prevent unintended paralleling or other unsafe operating states, while alarms and status indications should tell operators which source is supplying each section. Define responses to source failure, generator availability, failed transfer, overload, and return to normal power. Sequence timing is a project decision that must account for generator capability and connected equipment. Qualified professionals should determine protective devices, settings, ratings, and code requirements; the equipment design should reflect those project-specific decisions rather than assume a universal transfer scheme.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Match distribution to terminal operations

A terminal’s electrical distribution has to support both emergency operation and workable day-to-day maintenance. Separate essential and nonessential loads where the operating plan requires it, and consider whether critical functions need distinct distribution sections to limit the effect of a fault or maintenance outage. Bus arrangement, feeder locations, cable entry, space for terminations, and access to operating components can affect installation and service in a congested electrical room. The design should also account for the physical route between emergency sources, transfer equipment, and loads; a technically suitable lineup is not useful if field routing or room clearances make connections impractical. Consider future terminal changes, anticipated load growth, and how temporary construction tie-ins could affect emergency circuits. A review of one-line diagrams, equipment schedules, room layouts, and site conditions helps resolve these interfaces before fabrication. Any required voltage, current, withstand, environmental, or enclosure characteristics must be confirmed against the project documents and actual installation conditions.

Plan protection, testing, and maintainability

Protection and commissioning plans are central to dependable emergency service. The electrical engineer should coordinate protective-device settings across utility, generator, transfer, and downstream equipment so a fault is isolated appropriately without unnecessarily dropping unrelated essential loads. Available fault current, conductor and equipment ratings, selective coordination criteria where required, and arc-flash considerations all need project-specific evaluation. Do not treat a switchgear rating or a control sequence as a substitute for a coordinated study. Before turnover, the owner’s representatives, contractors, and qualified testing personnel should agree on acceptance procedures, including functional checks of source sensing, transfer permissives, interlocks, alarms, and load restoration. Testing should reflect the actual operating sequence and safe work practices, with clear responsibility for documenting results and correcting discrepancies. Maintenance access, component identification, wiring documentation, and control-power arrangements should also be considered early. Clear labeling and accessible service points make it easier for airport staff to understand the system and plan outages without compromising essential operations.

Prepare a useful equipment design package

A focused information package helps a manufacturer develop equipment around the airport’s operating requirements. Provide the latest one-line diagrams, load and feeder schedules, source and generator data, fault-current and coordination-study inputs, control narratives, preferred transfer sequence, and applicable project specifications. Include room plans, cable-entry requirements, environmental conditions, interface points, and any constraints on shipping, rigging, or installation access. Identify responsibility for relays, controls, metering, communications, and field wiring so scope gaps can be resolved before release. For low-voltage switchboards, determine whether UL 891 applies to the specified application and confirm the project’s documentation requirements; for medium- or high-voltage equipment, identify and verify standards applicable to that specific equipment. Standards compliance does not by itself establish a third-party listing. Switchgear Builder California builds new equipment in the USA with American components and supplies customers in California and nationwide. Schedule-sensitive or expedited options may be reviewed against scope and project conditions, without assuming a delivery commitment.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE