Confirm the System Voltage and Equipment Class
A project described as 35 kV usually identifies the nominal system voltage, not necessarily the switchgear’s maximum rated voltage. Equipment for this system is often associated with a 38 kV class, but that convention is not a substitute for confirming the required equipment rating. Start with the utility or facility one-line diagram, system grounding information, operating conditions and governing project documents. Verify nominal voltage, maximum system voltage, frequency and the insulation levels specified for the installation. Also establish whether the application is utility service, generation, industrial distribution or another duty; the context can affect the required arrangement and ratings. Ask the engineer of record or responsible utility contact to resolve inconsistent documents before the design is finalized. A clear distinction between system voltage and equipment class helps prevent mismatched components and late revisions. Ratings are project-specific design inputs, so qualified professionals must determine suitability against the actual system and applicable requirements.
Define Switching Configuration and Operating Needs
Metal-enclosed switchgear is an assembly concept, not a single switching arrangement. Define what the lineup must do: receive power, connect buses, serve outgoing feeders, sectionalize the system, or provide alternate-source operation. The one-line diagram should identify each device’s function and show normal and alternate operating states, including any normally open points. Consider whether operators need local control, remote operation, electrical or mechanical interlocking, or provisions for future circuits. These choices influence compartment layout, control wiring, bus organization and the space required for cable access. Evaluate maintainability alongside continuity: sectionalizing may help isolate part of a system, while adding devices and controls increases design complexity and coordination needs. Confirm the intended switching sequence and who is authorized to operate each device. Provide load schedules, source details, available fault-current information and expansion plans early. The manufacturer can then review the proposed configuration with the project team without assuming a standard lineup fits every 35 kV application.
| System | Voltage, phase, current and available fault current |
|---|---|
| Configuration | Lineup, protection, controls and enclosure as specified |
| Compliance | Applicable standards and listing confirmed for the assembly |
| Delivery | California and nationwide; schedule confirmed by quote |
Coordinate Insulation and Environmental Conditions
Insulation requirements depend on more than the nominal voltage. Identify the specified power-frequency withstand and impulse withstand levels, insulation medium or construction requirements, and any project criteria for clearances and creepage distances. These values must align with the equipment class and the electrical environment; they should be confirmed from applicable standards and the project specification rather than selected by rule of thumb. Describe the installation conditions as well: indoor or outdoor placement, altitude, ambient temperature range, humidity, contamination, seismic demands and exposure to corrosive or conductive dust can affect design assumptions. State whether space constraints, cable-entry direction, trench dimensions or access limitations shape the arrangement. If the switchgear connects to existing equipment, document interface dimensions, bus details and termination requirements, then verify them before release. Environmental and interface data give the design team a basis for evaluating insulation coordination and enclosure needs. A qualified engineer should resolve unusual conditions and approve the final ratings and installation requirements.
Specify Feeder Protection and System Coordination
Feeder protection should reflect the system study, connected loads and operating philosophy, not simply a device selection made in isolation. Provide short-circuit and load-flow study results when available, along with transformer data, conductor information, load characteristics, grounding method and any motor-starting or inrush considerations. Identify the protection functions required for each feeder and whether relays, instrument transformers, metering, communications or control interfaces are part of the intended design. The engineer responsible for protection should establish settings and coordinate them with upstream and downstream devices, including utility protection where applicable. Consider how trip power, control power, alarm points and remote signals will be supplied and integrated. Arc-flash analysis and safe work procedures are separate but important project responsibilities; equipment choices do not replace those evaluations. Confirm interrupting and withstand requirements against the calculated fault conditions. Qualified professionals must determine protective-device ratings, settings and applicable codes for the installation, then document assumptions and approval responsibilities.
Prepare a Complete Specification Package
A coordinated inquiry helps reduce ambiguity and makes technical review more productive. Include the one-line diagram, equipment schedule, physical layout, cable and bus interfaces, required ratings, insulation levels, control schematics and applicable project standards. For 35 kV equipment, identify the standards that govern the specific metal-enclosed switchgear and verify their applicability with the engineer of record; requirements vary by equipment type and jurisdiction. Do not treat a design standard as proof of a third-party listing or approval. Note required drawings, submittal milestones, inspection expectations, documentation, spare provisions and field connection responsibilities. Flag unresolved items explicitly, such as fault-current values, future feeder counts or utility interface details, so they can be closed before production decisions. California projects and customers elsewhere in the United States can share their project documents for review and discussion of a new equipment build. If schedule-sensitive options matter, raise them with the manufacturer early; feasibility and timing are subject to project review, confirmed scope and material considerations.