MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
Gray electrical switchgear with breakers in an industrial room, with loose conduit and fittings in the foreground.
AMERICAN BUILT   /   CALIFORNIA SERVED

Main-Lug Panelboards

A main-lug panelboard depends on protection and control arranged elsewhere. Define the feeder, upstream device, and local disconnect strategy before selecting the assembly.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Understand the Main-Lug Arrangement

A main-lug panelboard receives power through incoming feeder conductors that terminate at lugs; the panelboard does not include a main circuit breaker as its incoming disconnecting means. That distinction affects where overcurrent protection is provided, how the feeder is isolated, and what equipment operators use to disconnect the panel. Main-lug construction can suit a distribution layout where an upstream breaker or fused device already protects and controls the feeder, but it is not automatically appropriate just because the panel serves branch circuits. Map the source, feeder, panel, and downstream loads as a complete arrangement. Confirm whether a separate local disconnect is required by the installation, operating practice, or applicable code. Qualified professionals should establish the protection and disconnecting scheme for the specific project. The panelboard selection follows from that scheme, rather than replacing it.

Coordinate Upstream Overcurrent Protection

Identify the upstream overcurrent device that protects the conductors feeding the panelboard, and document its type, rating, trip or fuse characteristics, and location. Verify that the feeder conductors, panelboard bus, lugs, and downstream devices are coordinated with the available fault current and the intended protective arrangement. A device selected solely by nominal amperage may not address interrupting requirements, conductor protection, or the consequences of a fault at the panel. Where selective coordination, continuity of service, or specific clearing behavior matters, review the complete protective-device combination and its settings with the engineer of record. Confirm the relevant system voltage, phase, frequency, and source characteristics as design inputs. These details help establish suitable equipment requirements; they should not be treated as assumed capabilities. Share one-line diagrams and protection studies when available so design questions can be resolved before equipment details are finalized.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Define Feeder Entry and Terminations

Feeder connection details influence the panelboard layout and installation effort. Provide conductor material, quantity, size and insulation, along with the number of sets, raceway arrangement, and intended top or bottom entry. Confirm lug acceptance requirements for the actual conductor combination, including any project-specific termination preferences. Do not assume that a lug arrangement accommodates a particular wire size or multiple conductors without review. Also identify the incoming feeder’s routing, bend space constraints, pull direction, and the room available in the electrical enclosure. These practical conditions can affect enclosure dimensions and where field conductors can be landed. If the panel is part of a service or distribution system with grounding and bonding requirements, describe the system configuration and identify the design responsibility for those connections. Accurate connection information supports a more useful review of the proposed arrangement and helps installers avoid field conflicts.

Decide Whether a Local Disconnect Is Needed

A main-lug panelboard may rely on an upstream device for isolation, but the distance, accessibility, and operational purpose of that device can make a local disconnect an important project decision. Determine who must be able to shut off the panel, where that person will stand, and whether the disconnect must be visible, lockable, or readily accessible under the governing requirements. Consider maintenance procedures, emergency response, equipment grouping, and the impact of shutting down a shared upstream feeder. If a separate disconnect is planned, coordinate its location, enclosure, protective function, and relationship to the panel feeder; adding a device can affect space, wiring, and protection coordination. Requirements vary with the installation and applicable codes, so have qualified professionals make the determination. Clearly state whether the panel is intended to be main-lug-only with remote protection or part of an arrangement that includes an adjacent disconnect.

Prepare Project Inputs for Review

For a focused equipment review, provide the one-line diagram, load schedule, system voltage and phase, calculated or specified fault-current information, upstream device details, and feeder conductor and entry requirements. Include the desired branch-circuit configuration, enclosure environment, mounting arrangement, and any space or access constraints. Flag applicable codes and standards for the project and identify who will verify them; requirements depend on the equipment type and installation. UL 891 applies to applicable low-voltage switchboards, not automatically to every panelboard or other equipment, and a standards reference alone does not establish a third-party listing. The manufacturer can review the requested design inputs for a new panelboard assembly built in the USA with American components. If schedule-sensitive options are important, raise them early for project review without assuming a particular delivery commitment. A complete package makes it easier to resolve protection, connection, and disconnect questions before procurement and installation planning.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE