MANUFACTURED IN THE USA   /   SHIPPING NATIONWIDESALES & PROJECT SUPPORT   (951) 403-5738
A row of gray electrical cabinets beneath overhead cables along an industrial corridor.
AMERICAN BUILT   /   CALIFORNIA SERVED

Medium-Voltage Switchgear for Data Centers

Build a clearer basis for data center medium-voltage switchgear decisions by aligning feeder design, protective relays, source interfaces and maintenance access with the facility’s uptime strategy.

NEW SWITCHGEAR / AMERICAN COMPONENTS / BUILT TO SPEC01 — CALIFORNIA + NATIONWIDE
01
Made in the USAAmerican manufacturing
02
UL 891 switchboardsLow-voltage assemblies, as applicable
03
Short lead timesSchedule confirmed with quote
04
Nationwide shippingServing California & beyond
BUILT AROUND YOUR PROJECT / 01

Design feeder paths around the operating plan

Medium-voltage switchgear can form the distribution backbone between utility or on-site sources and downstream transformation serving data center loads. Start by mapping each feeder to its source, destination, normal state and role during an outage. That single-line view helps distinguish essential paths from alternate routes and exposes dependencies that may be hidden by equipment schedules alone. Redundant feeders are useful only when the upstream sources, bus sections, downstream connections and control schemes support the intended separation. Confirm whether the design uses independent lineups, sectionalized buses, tie breakers or another arrangement, and document when each device is expected to operate. Also identify future capacity needs, transformer interfaces and the consequence of losing a feeder. These inputs give the equipment builder a practical basis for layout and configuration review. Qualified electrical professionals should validate the topology against the facility’s reliability objectives, operating procedures and applicable codes.

Coordinate relays with the complete system

Protective relays must respond to faults selectively while limiting exposure to equipment and connected loads. Their settings cannot be chosen in isolation: they depend on source characteristics, transformer data, conductor impedance, grounding method, available fault current and the downstream protection scheme. Provide current one-lines and study information where available, and identify any planned changes to utility supply or on-site generation. The project team can then define relay functions, instrument-transformer requirements, trip logic, alarms and communications points for review. Coordination studies should test normal operation as well as credible alternate configurations, including bus ties or transfer states that change fault levels. Too little sensitivity may delay clearing; excessive sensitivity can cause unnecessary trips and undermine continuity. Establish who owns settings, testing and records before commissioning. A qualified protection engineer should determine final settings and verify coordination against the actual installed system and governing requirements.

THE DETAILS THAT DRIVE THE BUILD
Project specifications to define with your quote
SystemVoltage, phase, current and available fault current
ConfigurationLineup, protection, controls and enclosure as specified
ComplianceApplicable standards and listing confirmed for the assembly
DeliveryCalifornia and nationwide; schedule confirmed by quote

Treat source interfaces as a system boundary

The interface between medium-voltage switchgear and each source deserves explicit engineering, particularly where utility service, generators, energy storage or other generation may operate in different combinations. Define incoming voltage and frequency, grounding, phase sequence, fault contribution, metering needs and the intended points of isolation. Clarify how source transfer, paralleling, load shedding and interlocking are supposed to work, without assuming that a particular scheme is appropriate for every site. The utility and project engineer may have requirements for service protection, metering or operating authority; capture those early and verify them for the specific installation. For standby or parallel sources, consider how relay logic behaves through transitions and whether the approved sequence preserves the intended selective coordination. Identify control power, communications and status signals at the boundary as well. Agreeing on these responsibilities before fabrication reduces ambiguity during integration, testing and handover, while keeping source behavior aligned with the facility’s operational and safety procedures.

Make redundancy and maintenance compatible

Uptime planning should account for how equipment will be inspected, tested and serviced, not only how it behaves during a fault. Review whether operators can isolate the intended section while keeping alternate paths available, and identify any shared components that could defeat redundancy. Consider breaker withdrawal or access arrangements, working clearances, cable entry, lifting and handling routes, and the space required for safe work. A sectionalized arrangement may support maintenance flexibility, but it also introduces switching steps and interlocks that must be understood by trained personnel. Document normal lineup, transfer conditions, prohibited states and restoration sequence in the operating plan. Maintenance windows should be based on the actual work scope, risk assessment, outage permissions and site procedures; an alternate feeder does not by itself make work safe or interruption-free. Qualified professionals must establish isolation, protective measures and applicable code compliance for each task. Design reviews should include operations and maintenance representatives early.

Prepare project inputs and verify requirements

A focused request for quotation or design review should include the single-line diagram, system voltage, continuous and fault-duty requirements, feeder quantities, source arrangement, grounding method, environmental conditions and available footprint. Add relay and control expectations, communications protocols, cable termination details, metering needs, future expansion allowances and any owner or utility documents. Identify the standards and codes applicable to the specific medium-voltage equipment and installation, then confirm them with the responsible engineer and authority having jurisdiction; requirements vary by equipment type and project. Switchgear Builder California builds new switchgear in the United States with American components and supplies equipment to customers in California and nationwide, subject to project review. Discuss schedule-sensitive needs early, since feasibility depends on engineering scope, component requirements and other project factors; no timing should be assumed before review. The practical next step is to share current drawings and operating objectives so the team can clarify configuration, interfaces and open engineering decisions.

READY WHEN THE PROJECT IS

Let's get power moving.

From the first specification to the final shipment, start with a conversation about your project.

REQUEST A QUOTE